Document Number | 
Description | 
Author | 
File Type and Size | 
| 98-219r5 | 
Cable Media Performance Testing | 
Ed Armstrong, Zane Daggett, Bill Ham, Martin Ogbuokiri | 
PDF (1059745) | 
| 98-238r3 | 
Passive Lumped Capacitance Compensation on SCSI Signal Lines | 
Vit Novak | 
PDF (331805) | 
| 99-012r0 | 
Agenda for T10 Meeting #34 (November '99) | 
J. Lohmeyer | 
PDF (4442) | 
| 99-013r0 | 
T10 Project Summary - September '99 | 
J. Lohmeyer | 
PDF (4918) | 
| 99-014r0 | 
Jeopardy Letter for November '99 meeting | 
J. Lohmeyer | 
PDF (10298) | 
| 99-015r0 | 
Letter Ballot on forwarding SPI-3 to first public review | 
J. Lohmeyer | 
PDF (3444) | 
| 99-111r4 | 
Recommendations for content in SPI-3 relating to cable performance | 
Bill Ham | 
PDF (10396) | 
| 99-111r5 | 
Recommendations for content in SPI-3 relating to cable performance | 
Bill Ham | 
PDF (11078) | 
| 99-111r6 | 
Recommendations for content in SPI-3 relating to cable performance | 
Bill Ham | 
PDF (12266) | 
| 99-111r7 | 
Recommendations for content in SPI-3 relating to cable performance | 
Bill Ham | 
PDF (12432) | 
| 99-142r0 | 
Flow Control | 
Larry Lamers | 
PDF (21413) | 
| 99-148r2 | 
Proposal for Storage and Access of Data on Media Auxiliary Memory | 
Ian 'Sid' Crighton | 
PDF (110628) | 
| 99-179r3 | 
Logical Unit Self Tests | 
Mark Evans | 
PDF (40188) | 
| 99-179r4 | 
Logical Unit Self Tests | 
Mark Evans | 
PDF (42119) | 
| 99-179r5 | 
Logical Unit Self Tests | 
Mark Evans | 
PDF (41513) | 
| 99-202r1 | 
Minutes of T10 Plenary Meeting #32 -- July 15, 1999 | 
Weber & Lohmeyer | 
PDF (454719) | 
| 99-206r1 | 
MCM Additions to Fibre Channel Control page in FCP-2 | 
George Penokie | 
PDF (19530) | 
| 99-206r2 | 
MCM Additions to Fibre Channel Control page in FCP-2 | 
George Penokie | 
PDF (19783) | 
| 99-215r1 | 
Crosstalk Issues with 99-111r5 | 
Paul Aloisi | 
PDF (13947) | 
| 99-218r0 | 
Project Proposal for SMC-2 Standard | 
Erich Oetting | 
PDF (5550) | 
| 99-218r1 | 
Project Proposal for SMC-2 Standard | 
Erich Oetting | 
PDF (5482) | 
| 99-218r2 | 
Project Proposal for SMC-2 Standard | 
Erich Oetting | 
PDF (5504) | 
| 99-223r1 | 
Proposal for Storage and Access of Data on Media Auxiliary Memory | 
Sid Crighton | 
PDF (178267) | 
| 99-223r2 | 
Proposal for Storage and Access of Data on Media Auxiliary Memory | 
Steve Jerman | 
PDF (153915) | 
| 99-225r0 | 
QAS Arbitration Fairness | 
Rob Elliott | 
PDF (39382) | 
| 99-226r0 | 
Mode Page 19h DSA bit Clarification in FCP-2 | 
Jim Coomes | 
PDF (5376) | 
| 99-226r1 | 
Mode Page 19h DSA bit Clarification in FCP-2 | 
Jim Coomes | 
PDF (6013) | 
| 99-226r2 | 
Mode Page 19h DSA bit Clarification in FCP-2 | 
Jim Coomes | 
PDF (5657) | 
| 99-227r0 | 
Task management handling changes for SPI-3 | 
George Penokie | 
PDF (23848) | 
| 99-227r1 | 
Task management handling changes for SPI-3 | 
George Penokie | 
PDF (24682) | 
| 99-227r2 | 
Task management handling changes for SPI-3 | 
George Penokie | 
PDF (25027) | 
| 99-227r3 | 
Task management handling changes for SPI-3 | 
George Penokie | 
PDF (21982) | 
| 99-228r0 | 
Approved responses to SSC letter ballot comments | 
Dave Peterson | 
PDF (48244) | 
| 99-228r1 | 
Proposed response to SSC letter ballot comments | 
Dave Peterson | 
PDF (50556) | 
| 99-229r0 | 
Restricting Mode Page Code Usage | 
Ralph Weber | 
PDF (7403) | 
| 99-230r0 | 
Extended Copy Support for Persistent Reservations | 
Ralph Weber | 
PDF (15237) | 
| 99-230r1 | 
Extended Copy Support for Persistent Reservations | 
Ralph Weber | 
PDF (15593) | 
| 99-231r0 | 
EXTENDED COPY and Abort Task Management Functions | 
Ralph Weber | 
PDF (10486) | 
| 99-231r1 | 
EXTENDED COPY and Abort Task Management Functions | 
Ralph Weber | 
PDF (8553) | 
| 99-232r0 | 
SAM-2 Tasks and Work | 
Ralph Weber | 
PDF (8494) | 
| 99-232r1 | 
SAM-2 Tasks and Work | 
Ralph Weber | 
PDF (10384) | 
| 99-233r0 | 
SAM-2 TASK SET FULL Clarifications | 
Ralph Weber | 
PDF (9073) | 
| 99-233r1 | 
SAM-2 TASK SET FULL Clarifications | 
Ralph Weber | 
PDF (9176) | 
| 99-233r2 | 
SAM-2 TASK SET FULL Clarifications | 
Ralph Weber | 
PDF (10243) | 
| 99-234r0 | 
SMU Note for SPC-2 | 
Ralph Weber | 
PDF (7646) | 
| 99-236r0 | 
Minutes of SCSI signal modeling study group (draft) - July 29, 1999 | 
Dean Wallace | 
PDF (12382) | 
| 99-236r1 | 
Minutes of SCSI signal modeling study group (approved) - July 29, 1999 | 
Dean Wallace | 
PDF (21055) | 
| 99-237r0 | 
Draft IS on SCSI Controller Commands - 2 (SCC-2) | 
ISO/IEC | 
PDF (1856470) | 
| 99-238r0 | 
Response to NCITS 330 (RBC) 1PR comment #1 from Ralph Weber | 
John Lohmeyer | 
PDF (5672) | 
| 99-239r0 | 
Project Proposal for SCSI on Scheduled Transfer (SST) | 
Roger Ronald | 
PDF (24641) | 
| 99-239r1 | 
Project Proposal for SCSI on Scheduled Transfer (SST) | 
Roger Ronald | 
PDF (5910) | 
| 99-240r0 | 
Minutes of Joint T11/T10 Tape ad hoc Meeting - Aug 4, 1999 | 
Stewart Wyatt | 
PDF (17733) | 
| 99-241r0 | 
SPI-3 Setup and Hold Timings text changes | 
Rob Elliott | 
PDF (10045) | 
| 99-242r0 | 
Proposed addition to SPI-3 integrity check fall back procedure | 
John Lohmeyer | 
PDF (10059) | 
| 99-242r1 | 
Proposed addition to SPI-3 integrity check fall back procedure | 
John Lohmeyer | 
PDF (10772) | 
| 99-242r2 | 
Proposed addition to SPI-3 integrity check fall back procedure | 
John Lohmeyer | 
PDF (10631) | 
| 99-243r0 | 
Project Proposal for SCSI Signal Modeling (SSM) | 
Bill Ham | 
PDF (7953) | 
| 99-243r1 | 
Project Proposal for SCSI Signal Modeling Technical Report (SSM) | 
Bill Ham | 
PDF (13275) | 
| 99-244r0 | 
References to signal integrity publications | 
Bill Ham | 
PDF (11607) | 
| 99-245r0 | 
A detailed proposal for access controls (in SPC-2) | 
Jim Hafner | 
PDF (253097) | 
| 99-246r0 | 
Project Proposal for SCSI VI Protocol (SVP) | 
Ed Gardner | 
PDF (10454) | 
| 99-246r1 | 
Project Proposal for SCSI VI Protocol (SVP) | 
Ed Gardner | 
PDF (10625) | 
| 99-247r0 | 
FCP-2 changes from revision 02 to revision 03 | 
Bob Snively | 
PDF (154901) | 
| 99-248r0 | 
Ultra N Proposal / Adaptec | 
Vince Bastiani | 
PDF (595443) | 
| 99-249r0 | 
Parallel SCSI Extended Addressing Proposal | 
Charles Monia | 
PDF (52928) | 
| 99-249r1 | 
Parallel SCSI Extended Addressing Proposal | 
Charles Monia | 
PDF (50559) | 
| 99-250r0 | 
Proposal for Increasing the Addressability of Parallel SCSI | 
Charles Monia / Larry Lamers | 
PDF (45942) | 
| 99-250r1 | 
Proposal for Increasing the Addressability of Parallel SCSI | 
Charles Monia / Larry Lamers | 
PDF (45769) | 
| 99-258r0 | 
List lengths that exceed maximum allocation length | 
George Penokie | 
PDF (19692) | 
| 99-258r1 | 
List lengths that exceed maximum allocation length | 
George Penokie | 
PDF (20483) | 
| 99-259r0 | 
Beyond 2 Tbytes | 
George Penokie | 
PDF (33420) | 
| 99-260r0 | 
SPI-4 ISI reduction via transmit pre-compensation | 
William Petty | 
PDF (22899) | 
| 99-261r0 | 
SPI-4 timing budget utilizing receiver signal deskew method | 
William Petty | 
PDF (35582) | 
| 99-262r0 | 
SPI-4 REQ/ACK ISI removal via qualified clocking method | 
William Petty | 
PDF (34125) | 
| 99-263r0 | 
SSC Proposal to Support Partial Loading & Unloading | 
Paul Suhler | 
PDF (10345) | 
| 99-264r0 | 
Margin Control | 
Larry Lamers | 
PDF (29592) | 
| 99-265r0 | 
Comments on SAM multi-port model (rev 8 vs. rev 11) | 
George Ericson | 
PDF (25558) | 
| 99-266r0 | 
Description Lengths for 5D ASC/ASCQs | 
Ralph Weber | 
PDF (8412) | 
| 99-266r1 | 
Description Lengths for 5D ASC/ASCQs | 
Ralph Weber | 
PDF (8912) | 
| 99-267r0 | 
Minutes of SCSI Physical Working Group - Sept 13-14, 1999 | 
Weber & Lohmeyer | 
PDF (61980) | 
| 99-267r1 | 
Minutes of SCSI Physical Working Group - Sept 13-14, 1999 | 
Weber & Lohmeyer | 
PDF (63623) | 
| 99-268r0 | 
Minutes of SCSI Working Group - Sept 15, 1999 | 
Weber & Lohmeyer | 
PDF (61249) | 
| 99-268r1 | 
Minutes of SCSI Working Group - Sept 15, 1999 | 
Weber & Lohmeyer | 
PDF (61547) | 
| 99-269r0 | 
Minutes of T10 Plenary Meeitng #33 - Sept 16, 1999 | 
Weber & Lohmeyer | 
PDF (426341) | 
| 99-269r1 | 
Minutes of T10 Plenary Meeting #33 -- September 16, 1999 | 
Weber & Lohmeyer | 
PDF (426541) | 
| 99-270r0 | 
Minutes of SCSI signal modeling study group (draft) - Sept 1, 1999 | 
Bill Ham | 
PDF (28599) | 
| 99-270r2 | 
Minutes of SCSI signal modeling study group (approved) - Sept 1, 1999 | 
Bill Ham | 
PDF (28604) | 
| 99-271r0 | 
Proposed revision to T10 Electronic Procedures | 
John Lohmeyer | 
PDF (10778) | 
| 99-271r1 | 
Proposed revision to T10 Electronic Procedures | 
John Lohmeyer | 
PDF (11826) | 
| 99-272r0 | 
T10 Annual Report for 1999 | 
John Lohmeyer | 
PDF (177940) | 
| 99-273r0 | 
Address Assignment Pins on SCA and Three-in-one SFF 8009 connectors | 
Gene Milligan | 
PDF (8182) | 
| 99-274r0 | 
Forcing Bus Free from QAS -- Initiator Method | 
Richard Moore | 
PDF (3155) | 
| 99-275r0 | 
Presentation on the project proposal for SCSI on Scheduled Transfer | 
Donald Woelz | 
PDF (12598) | 
| 99-276r0 | 
proposed draft for SCSI on Scheduled Transfer | 
Don Woelz | 
PDF (106040) | 
| 99-276r1 | 
proposed draft for SCSI on Scheduled Transfer | 
Don Woelz | 
PDF (114977) | 
| 99-277r0 | 
Allow WRITE BUFFER when drive not ready | 
Gerry Houlder | 
PDF (5325) | 
| 99-278r0 | 
Presentation: A proposal for Access Control | 
Jim Hafner | 
PDF (486193) | 
| 99-280r0 | 
T11 liaison report to September T10 Plenary | 
Neil Wanamaker | 
PDF (15114) | 
| 99-281r0 | 
STA Liaison Report to T10 - September 16, 1999 | 
Paul Aloisi | 
PDF (20418) | 
| 99-284r0 | 
Quote on Conversion of RBC standard to ISO/IEC document | 
Ron Roberts | 
PDF (4316) | 
| 99-286r0 | 
Minutes of the SCSI Cable Media Performance WG (draft) - 9/28/99 | 
Bill Ham | 
PDF (6789) | 
| 99-287r0 | 
Minutes of SCSI signal modeling WG (draft) - Sept 29, 1999 | 
Bill Ham | 
PDF (21992) | 
| 99-288r0 | 
Minutes of Joint T10/T11.3 Activity (Tape) Ad Hoc - 9/14/99 | 
Stewart Wyatt | 
PDF (18751) |